{"id":10827,"date":"2026-03-05T11:41:10","date_gmt":"2026-03-05T11:41:10","guid":{"rendered":"https:\/\/www.crestamap.com\/2026\/03\/05\/what-does-a-project-manager-do-in-construction-and-why-is-it-key-to-avoid-cost-overruns\/"},"modified":"2026-03-05T11:41:13","modified_gmt":"2026-03-05T11:41:13","slug":"what-does-a-project-manager-do-in-construction-and-why-is-it-key-to-avoid-cost-overruns","status":"publish","type":"post","link":"https:\/\/www.crestamap.com\/en\/2026\/03\/05\/what-does-a-project-manager-do-in-construction-and-why-is-it-key-to-avoid-cost-overruns\/","title":{"rendered":"What does a Project Manager do in construction and why is it key to avoid cost overruns?"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\"><\/h1>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"600\" height=\"400\" src=\"https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image-2.png\" alt=\"\" class=\"wp-image-9874\" style=\"aspect-ratio:1.7777777777777777;object-fit:cover;width:714px;height:auto\" srcset=\"https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image-2.png 600w, https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image-2-300x200.png 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/figure>\n<\/div>\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p><\/p>\n\n<p>Construction is one of the most complex industries: tight deadlines, demanding regulations, multiple agents and a budget that can change in a matter of weeks if not controlled with precision. For this reason, more and more developers and investors are incorporating a key figure in their projects: the <strong>Project Manager in construction<\/strong>. <\/p>\n\n<p>However, the question many people ask themselves before hiring one is very simple:<br\/><strong>What does a Project Manager really do and why is he or she so important for the success of a project?<\/strong><\/p>\n\n<p>This article answers exactly that. With a technical, clear and practical approach, and supported by CrestaMap&#8217;s experience, we explain why this figure is not an additional cost, but an investment that avoids risks and cost overruns. <\/p>\n\n<p><\/p>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\"><strong>What is a Project Manager and what is his\/her role in construction?<\/strong><\/h2>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>A <a href=\"https:\/\/asana.com\/es\/resources\/become-a-project-manager\" target=\"_blank\" rel=\"noopener\"><strong>Project Manager (PM)<\/strong><\/a> is the professional responsible for <strong>planning, coordinating and supervising<\/strong> all phases of a project, ensuring that <strong>deadlines, costs and quality<\/strong> are met.<\/p>\n\n<p>According to the <a href=\"https:\/\/www.pmi.org\/\" target=\"_blank\" rel=\"noopener\"><em>Project Management Institute (PMI)<\/em><\/a>the Project Management discipline is based on <strong>aligning objectives, managing risks and ensuring efficient execution<\/strong> based on standardized processes and recognized global methodologies,<\/p>\n\n<p>While this definition applies to many sectors, in construction its role takes on an essential nuance: The Project Manager acts as the <strong>client&#8217;s sole interlocutor and technical guarantor<\/strong>, ensuring the profitability of the project from its conception to its delivery.<\/p>\n\n<p><\/p>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p><\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Difference between &#8220;what it is&#8221; and &#8220;what it does&#8221;.<\/strong><\/h3>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<ul class=\"wp-block-list\">\n<li><strong>What it is<\/strong>: an integral project manager, specialized in technical, economic and operational control.<\/li>\n\n\n\n<li><strong>What it does<\/strong>: coordinates, supervises, controls, anticipates risks, communicates, leads and ensures execution.<\/li>\n<\/ul>\n\n<p>That &#8220;what it does&#8221; is what really moves the needle on a construction project.<br\/><\/p>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p><\/p>\n\n<h2 class=\"wp-block-heading\"><strong>What a Project Manager does: key roles and responsibilities<\/strong><\/h2>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>Unlike other site agents, the <a href=\"https:\/\/www.eaebarcelona.com\/es\/blog\/que-es-un-project-manager\" target=\"_blank\" rel=\"noopener\">Project Manager<\/a> has a <strong>360\u00b0<\/strong> vision of the project. These are his main functions: <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>1. Technical coordination of design and work<\/strong><\/h3>\n\n<p>He supervises all the teams involved: architecture, engineering, construction companies, project management and specialists.<br\/>He is in charge of integrating all the information so that the project progresses in an orderly manner and without technical contradictions.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Budget management and cost control<\/strong><\/h3>\n\n<p>One of the most critical tasks.<br\/>The PM analyzes costs, validates certifications, controls deviations and updates forecasts through continuous <strong>technical-financial reporting<\/strong>.<\/p>\n\n<p>Studies by <em>ProjectManager.com<\/em> show that <strong>almost 70% of projects have deviations without an adequate control system<\/strong>.<br\/>PM prevents just that.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>3. Deadline management and planning<\/strong><\/h3>\n\n<p>Defines milestones, plans phases and verifies that teams meet established deadlines.<br\/>When delays are detected, triggers corrective actions.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>4. Quality control and regulatory compliance<\/strong><\/h3>\n\n<p>Verifies that the executed works comply with regulations (CTE, safety, energy efficiency) and defined quality standards.<br\/>Avoids subsequent corrections that increase costs.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>5. Risk management<\/strong><\/h3>\n\n<p>It evaluates technical, economic, contractual and operational risks.<br\/>Its role is to anticipate, not to react.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>6. Tender management and supplier contracting<\/strong><\/h3>\n\n<p>The Project Manager actively participates in the <strong>preparation, analysis and management of tenders<\/strong>, ensuring that documentation is clear, comparable and aligned with project objectives.<\/p>\n\n<p>Its function is not only to compare prices, but:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>validate the actual scope of the offers,<\/li>\n\n\n\n<li>detect omissions or hidden risks,<\/li>\n\n\n\n<li>ensure that the technical, economic and contractual conditions are consistent,<\/li>\n\n\n\n<li>and support the client in making informed decisions.<br\/><\/li>\n<\/ul>\n\n<p>An ill-conceived tender is often the source of many conflicts and subsequent cost overruns. The Project Manager acts here as <strong>guarantor of the balance between price, quality and risk<\/strong>. <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>7. Clear communication with the promoter and the teams<\/strong><\/h3>\n\n<p>It acts as a <strong>single point of contact<\/strong>, which reduces noise, speeds up decision making and provides document traceability.<br\/>The client has a clear and continuous view of the real status of the project, without intermediaries or contradictory messages.<\/p>\n\n<p><\/p>\n\n<p><\/p>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\"><strong>Project Manager vs Construction Management: differences that make a difference in results<\/strong><\/h2>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>In Spain there are classic construction figures:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Construction Management (DO)<\/li>\n\n\n\n<li>Material Execution Management (DEM)<\/li>\n\n\n\n<li>Health and Safety Coordinator (CSS)<\/li>\n\n\n\n<li>Construction Manager<\/li>\n<\/ul>\n\n<p>Each one fulfills a specific technical role, according to the LOE (Ley de Ordenaci\u00f3n de la Edificaci\u00f3n). However, none of them is designed to assume the integral management of the project. <\/p>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p><strong>So&#8230; how is a Project Manager different?<\/strong><\/p>\n\n<div style=\"height:15px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\"><strong>Scope of the role<\/strong><\/h3>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<ul class=\"wp-block-list\">\n<li><strong>Construction management (DO + DEM):<\/strong> focuses on the technical execution according to the project.<\/li>\n\n\n\n<li><strong>Construction manager:<\/strong> executes and organizes the construction company&#8217;s resources.<\/li>\n\n\n\n<li><strong>Project Manager:<\/strong> oversees all agents, integrates information and protects the developer&#8217;s vision.<br\/><\/li>\n<\/ul>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\"><strong>Main focus<\/strong><\/h3>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<ul class=\"wp-block-list\">\n<li>DO\/DEM \u2192 technical and compliance.<\/li>\n\n\n\n<li>PM \u2192 technical + economic + strategic.<br\/><\/li>\n<\/ul>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\"><strong>Neutrality and independence<\/strong><\/h3>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The PM defends the client&#8217;s interests, not those of the construction company.<\/p>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h3 class=\"wp-block-heading\"><strong>4. Risk prevention<\/strong><\/h3>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>The absence of a Project Manager usually translates into:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Cost overruns<\/li>\n\n\n\n<li>Delays<\/li>\n\n\n\n<li>Lack of coordination<\/li>\n\n\n\n<li>Changes not validated<\/li>\n\n\n\n<li>Poor communication<br\/><\/li>\n<\/ul>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>Cases analyzed by <em>RICS <\/em><a href=\"https:\/\/www.rics.org\/\" target=\"_blank\" rel=\"noopener\"><em>(Royal Institution of Chartered Surveyors)<\/em><\/a> show that coordination is the factor that has the greatest impact on the profitability of a project.<\/p>\n\n<div style=\"height:10px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p>In conclusion, PM does not replace Construction Management: it complements it, organizes it and maximizes its efficiency.<\/p>\n\n<p><\/p>\n\n<div style=\"height:13px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"600\" height=\"400\" data-src=\"https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image.png\" alt=\"\" class=\"wp-image-9860 lazyload\" data-srcset=\"https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image.png 600w, https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image-300x200.png 300w\" data-sizes=\"(max-width: 600px) 100vw, 600px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 600px; --smush-placeholder-aspect-ratio: 600\/400;\" \/><\/figure>\n\n<div style=\"height:13px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\"><strong>When to hire a Project Manager<\/strong><\/h2>\n\n<p>Although a Project Manager can be incorporated at any stage, the best results are obtained when he\/she intervenes from the beginning of the project, even before the design.<\/p>\n\n<h3 class=\"wp-block-heading\">Ideal phase: <strong>pre-conception and design.<\/strong><\/h3>\n\n<p>Here you can:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>Define a realistic budget<\/li>\n\n\n\n<li>Analyze technical feasibility<\/li>\n\n\n\n<li>Identify early risks<\/li>\n\n\n\n<li>Optimize constructive solutions<\/li>\n\n\n\n<li>Select suitable equipment<\/li>\n\n\n\n<li>Manage complete tenders<br\/><\/li>\n<\/ul>\n\n<h3 class=\"wp-block-heading\"><strong>During execution<\/strong><\/h3>\n\n<p>Reduce deviations, control certifications, manage changes and ensure quality.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>At the end of the project<\/strong><\/h3>\n\n<p>Supervises delivery, verifies documentations and ensures customer satisfaction.<\/p>\n\n<p>In CrestaMap, for example, projects have been managed where the early incorporation of PM has avoided between 10% and 20% of expected deviations, simply by technical and financial anticipation.<\/p>\n\n<div style=\"height:13px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\"><strong>The CrestaMap vision: customer-focused technical and financial management<\/strong><\/h2>\n\n<p>What sets CrestaMap apart is not only its technical expertise, but also its approach to management: rigorous, preventive and focused on transparency.<\/p>\n\n<p>Our methodology combines:<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Cost control and continuous reporting<\/strong><\/h3>\n\n<p>Periodic reports, financial traceability and real-time tracking.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>2. Multidisciplinary coordination<\/strong><\/h3>\n\n<p>Architects, quantity surveyors, engineers, construction companies and suppliers under a single system.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Technical management based on international standards<\/strong><\/h3>\n\n<p>Tools and processes aligned with best practices such as PMI and RICS.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>4. Clear and centralized communication<\/strong><\/h3>\n\n<p>A single channel for the customer, where every decision is documented.<\/p>\n\n<h3 class=\"wp-block-heading\"><strong>5. Risk prevention<\/strong><\/h3>\n\n<p>From start to finish, in all phases.<\/p>\n\n<p>In conclusion, a <strong>Project Manager in construction<\/strong> provides clarity, control, efficiency and safety in such a complex environment as a construction site.<br\/>Reduces risks, avoids cost overruns and acts as the technical ally that every developer needs to protect his investment.<\/p>\n\n<p><strong>At CrestaMap<\/strong>, we accompany our clients with a solid and transparent methodology, designed to maximize the profitability of each project.<\/p>\n\n<p><strong>Want to know how we can help you?<\/strong><strong><br\/><\/strong><a href=\"https:\/\/www.crestamap.com\/en\/contact\/\">Request a <strong>technical consultation<\/strong> and let&#8217;s review your project together.<\/a><\/p>\n\n<p><\/p>\n\n<div style=\"height:13px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"600\" height=\"400\" data-src=\"https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image-1.png\" alt=\"\" class=\"wp-image-9861 lazyload\" data-srcset=\"https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image-1.png 600w, https:\/\/www.crestamap.com\/wp-content\/uploads\/2025\/11\/image-1-300x200.png 300w\" data-sizes=\"(max-width: 600px) 100vw, 600px\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 600px; --smush-placeholder-aspect-ratio: 600\/400;\" \/><\/figure>\n\n<div style=\"height:13px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\"><strong>FAQ  <\/strong><\/h2>\n\n<div data-wp-context=\"{ &quot;autoclose&quot;: false, &quot;accordionItems&quot;: [] }\" data-wp-interactive=\"core\/accordion\" role=\"group\" class=\"wp-block-accordion is-layout-flow wp-block-accordion-is-layout-flow\">\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-1&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-1-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-1\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>What does a Project Manager do on a construction site?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-1\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-1-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p>Coordinates teams, controls costs, manages deadlines, supervises quality and acts as the sole interlocutor for the developer.<br\/><\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-2&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-2-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-2\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>What is the difference between a Project Manager and a Construction Manager?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-2\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-2-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p>The Construction Manager supervises execution and technical compliance; the Project Manager manages the project with an integral vision (costs, quality, risks, planning).<br\/><\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-3&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-3-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-3\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>When is it necessary to hire a Project Manager?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-3\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-3-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p>Ideally from the design phase, but it can be incorporated at any stage to improve control, efficiency and costs.<br\/><\/p>\n<\/div>\n<\/div>\n\n\n\n<div data-wp-class--is-open=\"state.isOpen\" data-wp-context=\"{ &quot;id&quot;: &quot;accordion-item-4&quot;, &quot;openByDefault&quot;: false }\" data-wp-init=\"callbacks.initAccordionItems\" data-wp-on-window--hashchange=\"callbacks.hashChange\" class=\"wp-block-accordion-item is-layout-flow wp-block-accordion-item-is-layout-flow\">\n<h3 class=\"wp-block-accordion-heading\"><button aria-expanded=\"false\" aria-controls=\"accordion-item-4-panel\" data-wp-bind--aria-expanded=\"state.isOpen\" data-wp-on--click=\"actions.toggle\" data-wp-on--keydown=\"actions.handleKeyDown\" id=\"accordion-item-4\" type=\"button\" class=\"wp-block-accordion-heading__toggle\"><span class=\"wp-block-accordion-heading__toggle-title\"><strong>What benefits does a Project Manager bring to the developer?<\/strong><\/span><span class=\"wp-block-accordion-heading__toggle-icon\" aria-hidden=\"true\">+<\/span><\/button><\/h3>\n\n\n\n<div inert aria-labelledby=\"accordion-item-4\" data-wp-bind--inert=\"!state.isOpen\" id=\"accordion-item-4-panel\" role=\"region\" class=\"wp-block-accordion-panel is-layout-flow wp-block-accordion-panel-is-layout-flow\">\n<p>Avoid cost overruns, reduce delays, ensure quality, improve communication and increase project profitability.<br\/><\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Construction is one of the most complex industries: tight deadlines, demanding regulations, multiple agents and a budget that can change in a matter of weeks if not controlled with precision. For this reason, more and more developers and investors are incorporating a key figure in&#8230;<\/p>\n","protected":false},"author":2,"featured_media":10425,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[6],"tags":[],"class_list":["post-10827","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/posts\/10827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/comments?post=10827"}],"version-history":[{"count":1,"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/posts\/10827\/revisions"}],"predecessor-version":[{"id":10828,"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/posts\/10827\/revisions\/10828"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/media\/10425"}],"wp:attachment":[{"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/media?parent=10827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/categories?post=10827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.crestamap.com\/en\/wp-json\/wp\/v2\/tags?post=10827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}